|
|
Work on Le Maméju (March 2013) Back in the water |  | Because of the tide in the Mary River, we had to get on the slipway the night before. At low tide, 4 AM, the tractor could bring us to the bottom of the slipway and 6 hours later Le Maméju was floating again! In the morning we sailed across the river to the Mary River Marina, where we stayed for 2 weeks to finalize our preparations. |
|
|
|
|
|